Are you our new distributor in the Netherlands?
Liftroller AS is providing faster, more efficient, and safe logistics at constructions sites. As a part of our growth strategy, we are continuously seeking distributors. To expand further, we are seeking distributors in the Nederlands.
Liftroller worldwide
Liftroller has displayed the Logistic products at large trade fairs like Bauma in Munich with great success. Liftroller has established distributors in Norway, Sweden, Denmark, France, Germany, Spain, Ireland, Israel, and Switzerland to either rent of resell Liftroller products. More information about Liftroller distributors here.
To expand further, we are seeking distributor in the Netherlands. Since Liftroller will be present with a booth at the APEX ERA trade show in Maastricht in June, we would like to get in touch with your company ahead of the event and share our plans.
So, is your company our new logistic distributor for the Liftroller products in the Netherlands?
Efficient construction site logistics with the Liftroller System
Material handling on construction sites is time-consuming, and constitutes a large number of hours during a construction project. There is a lot to be saved by using the right equipment, both when it comes to workers’ health and in direct hours saved in the project.
With the Liftroller system, you achieve faster, easier and safer material handling on your construction project. Building materials and equipment are rolled directly into the floors without heavy lifting and unnecessary time consumption.
Faster, easier and safer construction site logistics
- Eliminates carrying and heavy lifting, makes work more lustful.
- Reduces risk of injury to workers and increases safety.
- Faster unloading.
- Fewer workers needed to do the job.
- Prevents hazardous situations caused by improvised solutions.
- Fewer workers needed to do the job.
- Easy to use.
Better ergonomics
-
Heavy loads can be easily rolled into the building without the workers having to do any heavy lifting.
Efficient and time-saving
-
1-2 minutes from the crane operator lifts a package of plaster from ground level until the package is rolled into the 3rd floor, and the Liftroller is ready for the next package.
Cost-saving
-
A more efficient working day will result in great savings, Less time spend on handling materials is hours that will be used on construction work instead.
Assembly and use
- Lightweight, easy to assemble.
- Easy and intuitive to use.
- Flexible – can be used in many different types of buildings, including both renovations and newbuilds.