The Liftroller system – a flexible and adjustable logistics solution
The Liftroller system is flexible and adjustable and can therefore be used on a range of different building projects, including both renovations and newbuilds.
Here you can read more about some of the projects using Liftroller to transport materials.
Os Bygg used Liftroller in Bergen centre
Os Bygg has extensive experience with the Liftroller system. They have used Liftroller on several of their projects, both for the transport of building materials and equipment, and for the transport of construction waste. The fact that they come back to us and rent our products on constantly new projects is the biggest declaration of […]
Liftroller fitted in grand old listed building
AF Gruppen has chosen logistics from Liftroller as it prepares for an extensive rehabilitation of the grand old building at Inkognitogata 33 in Oslo Grand old building with listed façade Project: “Inkognitogata 33”Contractor: AF GruppenLocation: Inkognitogata 33, Frogner, Oslo AF Gruppen has begun an extensive rehabilitation of the grand old building at Inkognitogata 33. The […]
Flex Bygg deploys Liftroller on all remodelling projects
Flex Bygg AS in Bergen is a master builder with years of experience, skilled craftsmen and outstanding expertise. Flex Bygg is a preferred supplier to Thon Hotels and oversees most rebuilding projects for Olav Thon Gruppen. When general manager Michael Hansen was introduced to the Liftroller he knew immediately that this was a tool that […]
Liftroller provides solution to Thon Hotel Rosenkrantz extension
Thon’s preferred supplier, Flex Bygg AS, was contracted to expand Thon Hotel Rosenkrantz to incorporate the neighbouring building. The same firm had refurbished the same hotel inside and out only a few years earlier. The thought of constructing a huge rig to bring in materials and then cutting through the walls was not exactly tempting. […]
Liftroller provides value as stock exchange building is renovated
The contractor was forced to think new when renovating and converting the old stock exchange into a hotel. Such an old building poses a number of challenges when it comes to logistics. When Eivind Holmedal, construction manager at LAB, read about the Liftroller in the industry magazine Byggeindustrien he was in no doubt that the […]
Villa Copenhagen-12 tonnes of plasterboards in less than an hour
In less than an hour we shifted more than 12 tonnes of plasterboard through the windows and were able to meet the authorities’ demand of closing only for short periods Isak Digre, foreman, HENT Danmark AS Liftroller was chosen to provide logistics when the venerable former post office building in Copenhagen was being rebuilt. Lifting […]
Constructa AS chooses Liftroller when renovating Bergen City Hall
Constructa Entreprenør AS has chosen the Liftroller system to transport materials when carrying out a complete renovation of Bergen City Hall. Bergen City Hall is a precious building of national importance, which means transportation routes must be planned carefully in order not to damage the façade. The building is currently undergoing complete renovation both inside […]
Bredalsmarken 15-Rolling in materials on a remodelling project in Bergen
The Liftroller system has been chosen to ensure safer and more efficient handling of materials during the remodelling of the low-rise block at Bredalsmarken 15. Materials and equipment are craned onto the Liftroller Wall and then rolled onto the respective floors quickly and easily. Bredalsmarken 15, Bergen. Project: Bredalsmarken 15.Contractor: OBAS Entreprenør AS The low-rise […]
Remodelling project-Packs of plasterboard rolled through window
Helgesen Tekniske Bygg AS was faced with a series of heavy goods lifts when converting an office building in Kokstad into a dental clinic. Multiple packs of x-ray resistant plasterboard had to be taken to the first floor of the building. In the end the company chose to roll entire packs of plasterboard through the […]